Change size: A A A

Select Language and Region English

United Kingdom

You are currently viewing this version of the site

Case Studies

Case Studies

Holyhead Terminal

Holyhead terminal was the first walkway to be tested using Water Weights with a load of 132 tonnes.

Download the Holyhead Terminal PDF File (237K)

< back to case studies